General Board Documments

Emergency Contact Numbers Jan 2016

02Feb09-changing signing officers
ANNUAL PLANNING CALENDAR Board
BoD meeting agenda template
Co-operators Claim form
Confidentiality Agreement for Board
Costs to rent or buy washers and dryers
Ethical Conduct Agreement for Board

Conflict of Interest Agreement for Board
Liability and content insurance requirement

Contracts

2016 Jul 20 – Preventative Maintenance Agreement – Trinity Heating and Gas Inc

2015 Apr – COHO Contract

2015 May 27 – Terra Property Management – maintenance

Vision 20/20

Gas history 02-09
Hydro history 04-09
Water history 95-09

Capital Planning and Assessments

2006-09-06 ViewCourt capital plan
Capital-plan-1-07
Capital Plan 2013 Agreement

Remediation documents


2005

Rollout Proposal 2005
Uwe Report 2005- building assessment

2006

Falcon Assessment 2006
RJC Report

2007

2007 Apr 2 asbestos report 2 Theodor Sterling
2007 Jan 24 VC basement plan ST
2008 Feb 19 boiler room drawings and specs
Asbestos report – addendum
CCEC Letter Solar DHW proposal
Domestic Water Analysis 2007

Full Mech Spec B W
FWD boiler figures for grant application
Solar Feasibility Study View Court Co-op
View Court Co-op System Description
View Court Collector layout concepts 2007 04 21
View Court Solar Drawings 2007 10 11

2008

Affordable Warmth BC – View Court Report
Affordable Warmth- View Court Co-op Report 2008

Measured Drawings of buildings

A1-SITE-PLAN
A2-BASEMENT
A3-FIRST-FLOOR
A4-SECOND-FLOOR
A5-THIRD-FLOOR
A6-ROOF-PLAN
A7-NORTH-AND-EAST-ELEVATIONS
A8-SOUTH-AND-WEST-ELEVATIONS
A9-COURTYARD-ELEVATIONS
A10-SECTION
A11-HOUSE-BASEMENT-PLAN-AND-SECTION
A12-HOUSE-MAIN-AND-SECOND-FLR-PLAN
A13-HOUSE-ELEVATIONS

2009

2010

16Mar09 Remediation options
1210 View Court RFP Quote 2011 Planact
RFP quote from PlanAct (April 2010)

2011

Electrical Assessment

AES Proposal
Cobalt Proposal
ECM Proposal
VC Electrical Assesment Summary 3 options
VC—RFB-Electrical-Engineer
VC-Summary-of-Proposals
View Court Assesment AES

Hiring Project Manager

2011.07.25-1-Haddock.Anfossi.report-on-PM-contract
Contract—Project-Management—final
Electrical-Remediation-Project-2011-Q-and-As
Interview-questions-for-CRS-and-JTC-JuneJuly-2011
RFP-Project-Manager-2011–FINAL

JTC

Inv-20110903—VC
Inv-20111004—VC
Inv-20111101—VC
Inv-20111201—VC
Inv-20120101–VC-1
Inv-20120210

Managing Capital Projects

Managing Capital Projects Presentation
Tips for managing capital projects in housingco-ops
Working with capital reserve plan exercise

Solar DHW

12-10-Ave-W-Estimate-email
2011 Solar Domestic hot water comparisons
EMCO-heat-load-calculation-form
Viessmann-200Fx8-1-RETScreen4-1
Viessmann-200Fx8-RETScreen4-1
View Court Coop
View Court RET Screen Analysis

2012

2013

2014

2015